Prefabricated Plant-manufacture,factory,supplier from China

(Total 24 Products for Prefabricated Plant)
Basic InstructionOur inexperienced assembled metallic shape era device makes use of progressed node connection era. We completely don't forget the necessities of residential capabilities and smooth ornament on this confined area of the house, and there's now not the conventional metallic shape and a few concrete shape of the convex beam phenomenon.
  Связаться сейчас
Prefabricated Steel Bridges:Prefabricated steel bridges offer numerous advantages in the field of bridge construction.Firstly, prefabricated steel bridges provide a high level of quality control. Since the components are manufactured in controlled conditions, such as factories or precast yards, the quality of materials, manufacturing processes, and construction quality can be better controlled.
  Связаться сейчас
Basic InstructionThe steel components are painted with primer coating immediately after the shot blasting treatment and the interval between which is less than 30 seconds guaranteeing the strong adhesion film. The thickness of primer can be adjusted with different components to satisfy the anti corrosion requirement. The high quantity of surface treatment and strong primer adhesion together with normative fireproof coating guarantee the high efficient and long-term anti corrosion.Steel structure pre-treatmentSteel structure fabricationPacking and shipping
  Связаться сейчас
Steel structure is a natural fabricated structure, but not all steel structures are fabricated buildings, especially not good fabricated buildings. So what kind of steel structure building can be considered as a good prefabricated building?
  Связаться сейчас
InstructionPrimary heating, iron and metallic groups and thermal strength plant life in city wintry weather are large-scale coal-fired manufacturing, which has come to be the supply of air pollutants. in latest years, all localities have followed lively environmental protection guidelines.
  Связаться сейчас
Another advantage of prefabricated steel structures is their versatility in design. Steel allows for flexible architectural designs, enabling the creation of unique and visually appealing stadiums. The use of steel also ensures column-free spaces, providing unobstructed views for spectators and maximizing seating capacity.Additionally, the use of prefabricated steel structures reduces construction waste and promotes sustainability. The steel components are fabricated with precision, minimizing material wastage.
  Связаться сейчас
Basic InstructionThe metal components are painted with primer coating immediately after the shot blasting treatment and the c program languageperiod between that is much less than 30 seconds making sure the robust adhesion film. the thickness of primer may be adjusted with specific additives to meet the anti corrosion requirement. the high quantity of floor treatment and sturdy primer adhesion collectively with normative fireproof coating guarantee the high efficient and lengthy-time period anti corrosion.Steel structure pre-treatmentSteel structure fabricationPacking and shipping
  Связаться сейчас
Basic InstructionThe project team of Beijing Institute of technology independently designed and developed the "measure calculate control seek" technology system of carbon emission, successfully developed the Winter Olympic carbon measurement platform, integrated the human machine material environment data monitoring, carbon emission accounting, evaluation and control functions related to the Winter Olympic carbon emission, carried out the "carbon inventory", scientifically quantified the emission reduction contribution of various technologies, and realized the evaluation of
  Связаться сейчас
Basic InstructionOur green assembled steel structure technology system uses improved node connection technology. We fully take into account the requirements of residential functions and easy decoration in this limited space of the house, and there is no longer the traditional steel structure and some concrete structure of the convex beam phenomenon.
  Связаться сейчас
Basic InstructionIt's miles mentioned that because september 2021, the low-carbon generation control team of beijing college of technology has taken the lead and cooperated with 8 devices, which includes the countrywide velocity skating corridor, tsinghua university, beijing college of aeronautics and astronautics, hefei institute of cloth sciences of the chinese language academy of sciences, shandong guoshun lvjian technology co., ltd., beijing zhongchuang carbon investment era co., ltd., beijing green exchange co., ltd.
  Связаться сейчас
Basic InstructionIt is mentioned that due to the fact september 2021, the low-carbon era control team of beijing college of generation has taken the lead and cooperated with eight units, including the countrywide velocity skating hall, tsinghua college, beijing college of aeronautics and astronautics, hefei institute of material sciences of the chinese language academy of sciences, shandong guoshun lvjian generation co., ltd., beijing zhongchuang carbon investment era co., ltd., beijing inexperienced trade co., ltd.
  Связаться сейчас
Basic InstructionThe steel components are painted with primer coating immediately after the shot blasting treatment and the interval between which is less than 30 seconds guaranteeing the strong adhesion film. The thickness of primer can be adjusted with different components to satisfy the anti corrosion requirement. The high quantity of surface treatment and strong primer adhesion together with normative fireproof coating guarantee the high efficient and long-term anti corrosion.Steel structure pre-treatmentSteel structure fabricationPacking and shipping
  Связаться сейчас
Basic InstructionIt is reported that since September 2021, the low-carbon technology management team of Beijing University of technology has taken the lead and cooperated with 8 units, including the national speed skating hall, Tsinghua University, Beijing University of Aeronautics and Astronautics, Hefei Institute of material sciences of the Chinese Academy of Sciences, Shandong Guoshun Lvjian Technology Co., Ltd., Beijing Zhongchuang carbon investment Technology Co., Ltd., Beijing Green Exchange Co., Ltd.
  Связаться сейчас
Basic InstructionIt's far stated that because september 2021, the low-carbon generation manipulate crew of beijing university of technology has taken the lead and cooperated with eight devices, which incorporates the countrywide speed skating hall, tsinghua university, beijing college of aeronautics and astronautics, hefei institute of material sciences of the chinese language academy of sciences, shandong guoshun lvjian generation co., ltd., beijing zhongchuang carbon funding generation co., ltd., beijing green trade co., ltd.
  Связаться сейчас
H-section steel is a kind of economic section high-efficiency profile with more optimized section area distribution and more reasonable strength weight ratio. It is named after its section is the same as the English letter "H". Since all parts of H-shaped steel are arranged at right angles, H-shaped steel has been widely used for its advantages of strong bending resistance, simple construction, cost saving and light structure weight in all directions.
  Связаться сейчас
IntroducePlate warmness exchanger has the characteristics of excessive warmness trade overall performance, small heat loss, compact and mild-weight shape, small ground place, extensive software program and lengthy carrier life.
  Связаться сейчас
Basic InstructionIt is mentioned that due to the fact that september 2021, the low-carbon era control crew of beijing college of technology has taken the lead and cooperated with eight devices, along with the national pace skating corridor, tsinghua college, beijing college of aeronautics and astronautics, hefei institute of fabric sciences of the chinese language academy of sciences, shandong guoshun lvjian era co., ltd., beijing zhongchuang carbon investment era co., ltd., beijing green exchange co., ltd.
  Связаться сейчас
Falling film evaporation is to add the feed liquid from the upper tube box of the heating chamber of the falling film evaporator, evenly distribute it to each heat exchange tube through the liquid distribution and film-forming device, and form a uniform film to flow from top to bottom under the action of gravity, vacuum induction and air flow. During the flow process, it is heated and vaporized by the shell side heating medium. The generated steam and liquid phase enter the separation chamber of the evaporator together.
  Связаться сейчас
Product application in airport case show
  Связаться сейчас
Basic InstructionThe project team of Beijing Institute of technology independently designed and developed the "measure calculate control seek" technology system of carbon emission, successfully developed the Winter Olympic carbon measurement platform, integrated the human machine material environment data monitoring, carbon emission accounting, evaluation and control functions related to the Winter Olympic carbon emission, carried out the "carbon inventory", scientifically quantified the emission reduction contribution of various technologies, and realized the evaluation of
  Связаться сейчас
Basic InstructionIt is reported that since September 2021, the low-carbon technology management team of Beijing University of technology has taken the lead and cooperated with 8 units, including the national speed skating hall, Tsinghua University, Beijing University of Aeronautics and Astronautics, Hefei Institute of material sciences of the Chinese Academy of Sciences, Shandong Guoshun Lvjian Technology Co., Ltd., Beijing Zhongchuang carbon investment Technology Co., Ltd., Beijing Green Exchange Co., Ltd.
  Связаться сейчас
The high content of molybdenum, chromium and nitrogen make unss31254 have excellent resistance to pitting corrosion and crevice corrosion. The addition of copper improves the corrosion resistance in some acids. In addition, unss31254 has good stress corrosion cracking resistance due to its high nickel content and high chromium and molybdenum content.S31254 is an alloy material with corrosion resistance. Its density is 8.0g/cm3 and its melting point is 1320-1390 ℃. The carbon content of unss31254 is very low, which means that the risk of carbide precipitation due to heating is very small.
  Связаться сейчас
Curtain wall is the exterior wall enclosure of a building, which does not bear weight and is hung like a curtain, so it is also called "curtain wall". It is a light wall with decorative effect commonly used in modern large and high-rise buildings.
  Связаться сейчас
Relate News
On August 18, 2022, the high-quality development summit forum of the steel structure industry in the Yellow River Basin was successfully held in Jinan under the guidance of the housing and Urban Rural Development Department of Shandong Province, sponsored by the steel structure industry association of Shandong Province, and organized by Shandong Guoshun Construction Group Co., Ltd. and Guoshun Lvjian Technology Co., Ltd.
For the steel frame shape, with the growth of the wide variety of layers and height and bearing a large vertical load, the lateral resistance (wind load, earthquake movement, and so forth.) requirements turn out to be the primary bearing traits of the body.The steel frame shape device is typically divided into frame structure, frame bracing structure, body shear wall structure, and body tube structure.Frame shape: the frame contains columns and beams bearing vertical and lateral forces.
1. The portal body structure is a form of a closed structural system. it has a simple pressure, clean force transmission course, and fast creation pace. the introduction of a portal frame shape strengthens the bonding homes of partitions and generates extra flexible area layouts, as a consequence offering extra opportunities for engineering creativity.2. Metallic constructing body structures are used to assemble excessive-upward push and superb excessive-upward push buildings, multi-tale homes, and business office homes. with the power of its shape.
Aeronautics – aircrafts won’t be whole with out its structural metal additives.Car – automobile producers also count metallic as an important material.Creation – the best call for for structural steel comes from the development industry.
Recently, more than 400 tons of steel structure products produced and processed by Guoshun Group's smart factory passed the inspection and were loaded and shipped to New Zealand. On October, Guoshun Group's export volume has exceeded 100 containers. It is reported that the steel structure products shipped this time will be used in the construction of the "Ferry Terminal in Wellington and Picton, New Zealand".
These days there are warmness exchangers made of different substances. the choice of the suitable cloth is decisive for the function and carrier lifestyles. because of this, unique attention must be paid to it from the begin. viesel has been constructing heat exchangers only out of stainless-steel for over 50 years.excessive needs are made at the fabric in heat exchanger creation. warmth stresses because of the massive temperature differences can create cracks inside the fabric.
On July 5, Carl Peters, General Manager of Cedex Steel and Metals Ltd. in New Zealand, and Luan Xin, head of Qingdao Branch in China, visited Guoshun Group for inspection and exchange.
      The reconstruction project of national fitness center in Changqing district undertaken by Guoshun Group was selected as gold medal project of Steel structure in Shandong Province by Shandong Steel Structure Industry Association.       The National Fitness Center project in Changqing District is a key project in Changqing District. With a total investment of 140 million yuan, the project covers an area of 38197.1 square meters and a total construction area of 26188.85 square meters, including 21772.21 square meters of newly built construction area.
Recently, the Third Forum on the Coordinated Development of the Belt and Road Initiative and the Building of a Manufacturing Powerhouse and the 2022 China Industrial Carbon Summit Forum were held in Hainan Province. At the meeting, the list of "the first Chinese industrial carbon peak 'leader' enterprises" was released, and a total of 42 outstanding enterprises were selected.
Sheikh Abdullah Al Salem Cultural Centre (ASCC) is a new world-class museum district within Kuwait City. Together with the Sheikh Jaber Al Ahmad Cultural Centre (JACC), and recently restored Al Salam Palace, also SSH projects, it will form Kuwait’s new national cultural district,GuoShun Group supply the Main steel structure,SSH as general contractor.The museums are a celebration of Kuwaiti, Islamic and Arab culture and history.